Pump selection
The pump line and model are selected from the flow and the total head of the project, not from a pump that was chosen in advance.
Project Support
For EPC contractors, irrigation contractors, water supply projects, engineering companies and tender teams: the equipment selection, the documents a project asks for, and the commissioning and monitoring that follow.
Pump, inverter and storage at a project site.
01 / The project path
Each stage settles one question, so the offer, the documents and the handover do not come back later as a change.
The order is the point: a project scope is only quotable once the duty, the equipment and the documents have been settled in that order.
02 / Project evaluation
A project is evaluated from what the project already has. Send what exists, and we say what is still missing before an offer is issued.
What comes back is which pump line and which inverter suit the requirement, and where the requirement is not covered by the range.
The requirement is answered with the equipment that fits it.
03 / System engineering
The equipment is configured as one system: a change in any of these four changes the others.
The pump line and model are selected from the flow and the total head of the project, not from a pump that was chosen in advance.
The inverter is matched on the motor current of the selected pump, not on a power figure alone.
Module data, string design, the combiner box and the protection around the array, worked out for the site and for the selected pump.
Pump, inverter, array and the accessories around them configured as one system for the installation.
04 / BOQ & technical documentation
Each one is prepared for the project and confirmed against the specification it is written to. Documents that are already published are available from Technical resources.
The document set follows the project: it is written against the specification the project is working to and confirmed with the equipment that is proposed for it.
05 / Tender support
Support during a tender is technical: the answers and the documents the process asks for, with no claim about its outcome.
The specification is answered point by point, and anything that is not covered is named rather than passed over.
The equipment is matched against the specification the tender is written to, and any deviation from it is stated.
What can be provided for the order is confirmed before the order is placed.
Questions raised during clarification are answered from the project data and the configuration that was proposed.
06 / Supply, commissioning and monitoring
HOBER supplies equipment and the engineering support behind it. HOBER is not an EPC contractor and does not take on site construction; the works on site stay with the project team.
The equipment is supplied and supported; the site works stay with the project team.
The solar pump inverter, the pump and the related system equipment are offered as one combined supply scope for the project, so the equipment is proposed as a matched set rather than as separate parts.
Remote guidance covers how the equipment is installed, the parameters set for the selected pump and inverter, the first run, and fault finding afterwards — worked through with the team that installs it.
Monitoring is configured per project: optional flow metering and 4G or WiFi remote monitoring where the project includes them.
07 / Questions from project teams
The required flow, the total head, the water source, the pipeline and its route, the operating hours and the power source available at the site — together with the specification the project is working to, where one exists.
BOQ, datasheets, system, wiring and single line diagrams are prepared for the project and confirmed against the specification. What is already published is available from Technical resources; anything written for a project is prepared with the project.
It is agreed with you before anything is committed. We propose the matched equipment and the scope; the project team confirms it against the site and the specification.
No. HOBER supplies equipment and engineering support and does not act as an EPC contractor. Construction, civil works and site labour stay with the project team; installation is guided remotely and commissioning is worked through with the team that installs the system.
Next step
Share the flow, the total head, the water source, the power available at the site and the specification you are working to. The answer comes back as the matched pump and inverter, the supply scope, and the documents the project asks for.