Installer Support

Convert existing AC pumps
to solar with confidence.

For solar installers, pump installers, irrigation installers and solar pump system integrators: the workflow that takes an existing AC pump from its nameplate to a commissioned installation, and the support that runs with it.

HOBER solar pump inverter with an existing AC pump

The inverter that drives the existing pump

01 / The workflow

From the pump nameplate
to a running installation.

Nine stages, in the order they are worked through. Each one settles a question that would otherwise come back on site.

“How do I convert this AC pump to solar correctly?”The answer is a sequence rather than a product, and every stage below depends on the one before it.

  1. 01 Pump data What the motor nameplate has to show: power, voltage, phase and rated current.
  2. 02 Pump compatibility check Whether the motor can be driven from a solar pump inverter at all.
  3. 03 Inverter matching The inverter that carries the motor current of this pump.
  4. 04 PV sizing The array the duty point needs, from the flow and total head of the site.
  5. 05 Wiring The cable and the protection between the array, the inverter and the pump.
  6. 06 Parameter setup The settings this installation needs before it is started.
  7. 07 Commissioning The first run: the checks made when the pump is started on solar.
  8. 08 Monitoring What the running system reports, and where those readings are read.
  9. 09 Troubleshooting Where a fault is looked for, starting from the readings the installation gives.

The order is the point. A stage that is skipped usually comes back as a fault after commissioning, which is why the workflow is worked through rather than picked from.

02 / What we need from the pump

The nameplate first.
Then the duty and the site.

A compatibility check starts from what the pump is and what it has to do. Send what you have and the check works from that.

  • Pump and motor nameplate: power, voltage, phase and rated current
  • The flow and the total head the site needs
  • The water source and the pipe run
  • How the installation is powered today
Submersible pump waterproof cable

The cable run is part of the check

03 / What the support covers

The system, worked out
around your installation.

Six areas an installer can bring to us, from the pump that is already on site to the fault that shows up a season later.

Pump matching

The inverter is matched from the pump nameplate and from the duty of the site, not from a power figure alone.

PV sizing

The array, the module data, the string design and the combiner box are worked out for the site and for the pump that was selected.

Wiring & protection

The run from the array to the inverter and from the inverter to the pump, the cable, the output filter or reactor, grounding, and lightning protection where the site calls for it.

Installation & parameter setup

The settings an installation needs, including water level control, dry-run protection and hybrid solar with grid or generator operation where the selected model and the site allow it. Each one is configured for the installation, never assumed for every model.

Flow & remote monitoring

Optional flow metering and 4G or WiFi remote monitoring where the installation includes them, with the running data and the fault information they report.

Commissioning & troubleshooting

Support through the first run and, afterwards, fault analysis from the readings the installation reports, so an installer does not have to drive back to site to answer a question.

Water level control, dry-run protection, hybrid grid or generator input, flow metering and remote monitoring are options rather than standard functions: each one is confirmed against the selected model and the installation.

Solar pump inverter unit

The parameter list and the readings come from here

04 / After the installation

An answer about
the installation, not a guess.

Questions that arrive after commissioning are answered from what the system is doing now, so the first reply can be the useful one.

  • What the system does now, and what it does not do
  • The readings taken on site
  • The parameter list from the inverter
  • Photographs of the nameplate and the wiring

Those four usually settle the question without a site visit, which is the point: a visit is kept for what a reading cannot show.

05 / Questions

Questions installers ask
before they start.

Can any AC pump be converted?

No. The motor has to be one a solar pump inverter can drive, and the pump has to suit the duty the site needs. Those two things are what the nameplate check and the compatibility check settle, and where the answer is no we say so before anything is proposed.

What nameplate data do you need?

The power, voltage, phase and rated current on the motor plate, the pump model, and how the installation is powered today. A clear photograph of the plate is enough to start the check.

Can the system keep grid or generator backup?

Where a hybrid model is selected and the site is wired for it, the installation can run from the grid or a generator when solar is not enough. It is confirmed per installation rather than assumed, so tell us what the site has.

What happens if the pump was not bought from HOBER?

Send the same details. The check works from the pump and the site rather than from the order, and we say what can be supported. Where the pump is not suitable for a conversion, we say that too.

Next step

Send the nameplate.
We check the motor and the site.

Share the motor nameplate, the duty the site needs and how the installation is powered today. Our sales team reviews the conversion and answers with the equipment that fits the pump and the site.